Stormwater Management Master Plan Project

Share Stormwater Management Master Plan Project on Facebook Share Stormwater Management Master Plan Project on X (formerly Twitter) Share Stormwater Management Master Plan Project on Linkedin Email Stormwater Management Master Plan Project link
drain in ground with rocks and grass around it

The City of Owen Sound has initiated a Stormwater Management Master Plan (SWMMP) to develop a long-term plan for the safe and effective management of stormwater runoff.

This project aims to review the entire City’s drainage system (storm sewers, ditches, storm management ponds, overland spill routes, watercourses, etc.) and develop a long-term plan for the safe and effective management of stormwater runoff. The City is evaluating the stormwater management of public lands (road allowances and publicly owned property), not private property drainage issues.

This Stormwater Management Master Plan will steer future projects by identifying deficient areas, recommending improvements, and prioritizing projects so capital reserves can be set aside to complete the work. The SWMMP's findings and recommendations will be incorporated into future projects.

Public Input:

Feedback from residents will help to identify localized drainage issues the City may not be aware of. The public can also provide input regarding possible solutions to consider for future stormwater or drainage projects. Public participation will be gathered and documented as part of the final report.

Join an Information Session

  • Wednesday, November 25, 2026 | 3:30 to 5:30 p.m. | Council Chambers at City Hall, 808 2nd Avenue East
    The team will share the improvements it currently recommends and ask for feedback before finalizing its recommendations. Residents can review the proposals, ask questions of City staff and representatives from Tatham Engineering, and use comment sheets available at the open house to tell the project team which options they prefer.

Supporting documents, including the Open House Boards and 60% Stormwater Master Plan Report, will be available on this page soon.

A fillable PDF form for public comments will also be available and can be downloaded, completed and emailed to shammill@owensound.ca
and/or jmacdonald@tathameng.com.

The City of Owen Sound has initiated a Stormwater Management Master Plan (SWMMP) to develop a long-term plan for the safe and effective management of stormwater runoff.

This project aims to review the entire City’s drainage system (storm sewers, ditches, storm management ponds, overland spill routes, watercourses, etc.) and develop a long-term plan for the safe and effective management of stormwater runoff. The City is evaluating the stormwater management of public lands (road allowances and publicly owned property), not private property drainage issues.

This Stormwater Management Master Plan will steer future projects by identifying deficient areas, recommending improvements, and prioritizing projects so capital reserves can be set aside to complete the work. The SWMMP's findings and recommendations will be incorporated into future projects.

Public Input:

Feedback from residents will help to identify localized drainage issues the City may not be aware of. The public can also provide input regarding possible solutions to consider for future stormwater or drainage projects. Public participation will be gathered and documented as part of the final report.

Join an Information Session

  • Wednesday, November 25, 2026 | 3:30 to 5:30 p.m. | Council Chambers at City Hall, 808 2nd Avenue East
    The team will share the improvements it currently recommends and ask for feedback before finalizing its recommendations. Residents can review the proposals, ask questions of City staff and representatives from Tatham Engineering, and use comment sheets available at the open house to tell the project team which options they prefer.

Supporting documents, including the Open House Boards and 60% Stormwater Master Plan Report, will be available on this page soon.

A fillable PDF form for public comments will also be available and can be downloaded, completed and emailed to shammill@owensound.ca
and/or jmacdonald@tathameng.com.

  • Public Information Centre #2 – November 25, 2026

    Share Public Information Centre #2 – November 25, 2026 on Facebook Share Public Information Centre #2 – November 25, 2026 on X (formerly Twitter) Share Public Information Centre #2 – November 25, 2026 on Linkedin Email Public Information Centre #2 – November 25, 2026 link

    The City of Owen Sound invites residents to review proposed drainage improvements and share feedback at its second Public Information Centre for the Stormwater Management Master Plan. The open house will take place on Wednesday, November 25, 2026, from 3:30 to 5:30 p.m. in Council Chambers at City Hall, 808 2nd Avenue East.

    At the first Public Information Centre in December 2024, the project team shared the drainage problems it had identified and asked residents about other areas of concern and possible solutions. That input helped inform the options the team evaluated. At the November 25 open house, the team will share the improvements it currently recommends and ask for feedback before finalizing its recommendations.

    Residents can review the proposals, ask questions of City staff and representatives from Tatham Engineering, and use comment sheets available at the open house to tell the project team which options they prefer. Public feedback will help shape the final recommendations and will be documented in the final report.

    The Stormwater Management Master Plan will guide how Owen Sound manages runoff from rain and melting snow. It will identify drainage problems and help the City prioritize improvements to reduce flooding, improve public safety and make the drainage system easier to maintain. The study covers City-owned land and public road allowances across Owen Sound, including storm sewers, ditches, culverts, watercourses and stormwater management ponds.

    The City will post the presentation materials before the open house at OurCity.OwenSound.ca/Stormwater-Master-Plan. Materials from the first Public Information Centre are also available on the project page.

    The City has retained Tatham Engineering Limited to complete the study through the Municipal Class Environmental Assessment Master Planning Process.

    Download the Public Information Centre Notice

    For more information, please contact:

    Jacob Macdonald, P. Eng., Engineer with Tatham Engineering, at 705-444-2565 ext. 2161, or email jmacdonald@tathameng.com

    Spencer Hammill, P.Eng., Engineering Services Division with the City of Owen Sound, at 519-376-4440 ext. 3301 or email shammill@owensound.ca

    Quick Facts

    • The City held its first Public Information Centre in December 2024 to gather feedback on local drainage problems and potential solutions.
    • The second Public Information Centre will take place on Wednesday, November 25, 2026, from 3:30 to 5:30 p.m. in Council Chambers at City Hall.
    • The Stormwater Management Master Plan will help the City prioritize future drainage improvements on City-owned land and within public road allowances.

    The City of Owen Sound invites residents to review proposed drainage improvements and share feedback at its second Public Information Centre for the Stormwater Management Master Plan. The open house will take place on Wednesday, November 25, 2026, from 3:30 to 5:30 p.m. in Council Chambers at City Hall, 808 2nd Avenue East.

    At the first Public Information Centre in December 2024, the project team shared the drainage problems it had identified and asked residents about other areas of concern and possible solutions. That input helped inform the options the team evaluated. At the November 25 open house, the team will share the improvements it currently recommends and ask for feedback before finalizing its recommendations.

    Residents can review the proposals, ask questions of City staff and representatives from Tatham Engineering, and use comment sheets available at the open house to tell the project team which options they prefer. Public feedback will help shape the final recommendations and will be documented in the final report.

    The Stormwater Management Master Plan will guide how Owen Sound manages runoff from rain and melting snow. It will identify drainage problems and help the City prioritize improvements to reduce flooding, improve public safety and make the drainage system easier to maintain. The study covers City-owned land and public road allowances across Owen Sound, including storm sewers, ditches, culverts, watercourses and stormwater management ponds.

    The City will post the presentation materials before the open house at OurCity.OwenSound.ca/Stormwater-Master-Plan. Materials from the first Public Information Centre are also available on the project page.

    The City has retained Tatham Engineering Limited to complete the study through the Municipal Class Environmental Assessment Master Planning Process.

    Download the Public Information Centre Notice

    For more information, please contact:

    Jacob Macdonald, P. Eng., Engineer with Tatham Engineering, at 705-444-2565 ext. 2161, or email jmacdonald@tathameng.com

    Spencer Hammill, P.Eng., Engineering Services Division with the City of Owen Sound, at 519-376-4440 ext. 3301 or email shammill@owensound.ca

    Quick Facts

    • The City held its first Public Information Centre in December 2024 to gather feedback on local drainage problems and potential solutions.
    • The second Public Information Centre will take place on Wednesday, November 25, 2026, from 3:30 to 5:30 p.m. in Council Chambers at City Hall.
    • The Stormwater Management Master Plan will help the City prioritize future drainage improvements on City-owned land and within public road allowances.
  • Public Information Centre #1 – December 18 & 19, 2024

    Share Public Information Centre #1 – December 18 & 19, 2024 on Facebook Share Public Information Centre #1 – December 18 & 19, 2024 on X (formerly Twitter) Share Public Information Centre #1 – December 18 & 19, 2024 on Linkedin Email Public Information Centre #1 – December 18 & 19, 2024 link

    In December 2024, the City of Owen Sound and Tatham Engineering held the first Public Information Centre for the Stormwater Management Master Plan. The project team shared what it had learned about drainage problems on public property and along City roads, and presented early options to address them.

    Residents could watch a recorded presentation and ask questions at a virtual session on December 18 or in person at City Hall on December 19. The project team asked residents to point out other places where they had noticed flooding or drainage problems and share their views on the options.

    That feedback helped the team develop and evaluate options for improving drainage. At the second Public Information Centre on November 25, 2026, the team will share the options it currently recommends and ask for your feedback.

    Resources

    In December 2024, the City of Owen Sound and Tatham Engineering held the first Public Information Centre for the Stormwater Management Master Plan. The project team shared what it had learned about drainage problems on public property and along City roads, and presented early options to address them.

    Residents could watch a recorded presentation and ask questions at a virtual session on December 18 or in person at City Hall on December 19. The project team asked residents to point out other places where they had noticed flooding or drainage problems and share their views on the options.

    That feedback helped the team develop and evaluate options for improving drainage. At the second Public Information Centre on November 25, 2026, the team will share the options it currently recommends and ask for your feedback.

    Resources

Page last updated: 10 Nov 2026, 11:27 AM